References
1. A.Jain;R.Bhatti;H.S.DeepandS.K.Sharma;ImplementationofTPMforEnhancingOEEofSmall Scale Industry. International Journal of IT, Engineering and Applied Sciences Research (IJIEASR), 1(1), 125-136 (2012).
2. A.K.GuptaandR.K.Garg;OEEImprovementbyTPMImplementation:ACaseStudy.International Journal of IT, Engineering and Applied Sciences Research (IJIEASR), 1(1), 115-124 (2012).
3. B. Dal; P. Tugwell and R. Greatbanks; Overall Equipment Effectiveness as a Measure of Operational Improvement. International Journal of Operations Production Management, 20(12), 1488-1502 (2000).
4. H. G. Hegde; Overall Equipment Effectiveness Improvement by TPM and 5S Techniques in a CNC Machine Shop. Journal of Quality in Maintenance Engineering, 8(2), 25-32 (2009).
5. P. H. Tsarouhas; Evaluation of Overall Equipment Effectiveness in the Beverage Industry: A Case Study. International Journal of Production Research, 51(2), 515–523 (2013).
6. P. Gupta and S. Vardhan; Optimizing OEE, Productivity and Production Cost for Improving Sales Volume in an Automobile Industry through TPM: A Case Study. International Journal of Production Research, 54(10), 2976–2988 (2016).
7. P. Jonsson and M. Lesshammar; Evaluation and Improvement of Manufacturing Performance Measurement Systems – The Role of OEE. International Journal of Operations & Production Management, 19(1), 55-78 (1999).
8. S. Elevli and B. Elevli; Performance Measurement of Mining Equipments by Utilizing OEE. Acta Montanistica Slovaca, 15(2), 95-101 (2010).
9. V. Lahri and P. Pathak; A Case Study of Implementation of Overall Equipment Effectiveness on CNC Table Type Boring & Milling Machine of Heavy Machinery Manufacturing Industry. Journal of Mechanical and Civil Engineering, 12(5V), 63-70 (2015).
10.Y. B. Ngadiman; B. B. Hussin and I. B. A. Majid (2013); Exploring the Overall Equipment Effectiveness (OEE) in an Industrial Manufacturing Plant. 2nd International Conference on Global Optimization and Its Applications, 28-38.