D.P. Jr. Gaver; Time to failure and availability of a parallel system with repair, IEEE Trans. Reliab., 12 30-38 (1963).
P. P. Gupta; Complex System Reliability with General Repairman
Distribution under Different Repair Preemptive Resume Repair
Discipline, Microelectron. Reliab., 12 351-356(1973).
M.N. Gopalan; Availability and reliability of a
series-parallel system with a single repair facility, IEEE Trans.
Reliab., 24(3); 219 – 220(1975).
S.K. Singh and R.P. Singh ; Stochastic Analysis of A Complex
System with Two Types of Repair Facilities and Patience Time of Repair,
IJOMAS, 5 (1) 43-56(1989).
N. Venugopal; Y. Krishan Reddy; Optimal (n, m, N*)
series-parallel system with fixed repair facility, Int. J. System Sci.,
20(2), 229 – 233 (1989).
J.P.S. Joorel ; MTSF and Availability Analysis of a Complex
System Composed of Two sub-system in series subject to Random Shocks.
Microelectron. Reliab. 30(3) 463-466(1990).
S. Song and Y. Deng; Reliability analysis of three-unit system
in a changing environment, Microelectron. Reliab.,33(5), 637 –
639(1993).
A. Kumar; M.C. Rander ; R.K. Tuteja ; Reliability analysis of a
complex redundant system, MicroelectronReliab., 33, 459-460(1993).
A.C. Butler; S.S. Rao; Steven R. LeClair; Reliability analysis
of complex systems using symbolic logic, Reliability Engineering and
System Safety, 40(1) 49-60 (1993).
S. Attahiru; W.L. Alfa ; Y. Q. Zhao ; Stochastic analysis of a
repairable system with three units and repair facilities,
Microelectron. Reliab., 38(4), 585-595(1998).
J.P.S. Joorel; V. Kumar ; C. Lal ; Reliability Analysis of A
Complex System Composed Of Two Parallel Subsystem, Jr. Ind. Soc. Stat.
Operas. Res., 22 1-4 25-35(2001).
V.S.S. Yadavalli ; Stochastic model of complex system
consisting of generators, each with main and auxiliary switch boards,
Int. J. Manag. Syst., 17 231-242 (2001).
R. Gupta; P. Kumar ; V. Sharma ; Cost benefit analysis of a
three unit complex system with correlated failures and repairs, Jr. of
mathematical sciences, 1( 3) 213-226(2006).
R. Bashir ; J.P.S. Joorel Reliability Analysis of a three unit
complex system working in series-parallel configuration, Indian Journal
of Statistics and Application, 2(1-2) 89-103(2013).
R. Bashir ; J.P.S. Joorel ; Reliability measures of a three
non-identical repairable redundant complex system with load sharing
units working in parallel, International Jr. of Statistics and
Reliability Engineering, 1(2),113-129(2014).
A. Kumar; V. Kumar; V. Modgil; Behavioral Study and
Availability Optimization of a Multi-Stage Repairable System with Hot
Redundancy, International Journal of Quality and Reliability Management,
36(3) 314-330(2019).
K. Meenakshi; S.B. Singh;A. Kumar (2019):Reliability Analysis
of Multi-Stage Complex System with Multi-Stage Weighted Subsystem,
International Journal of Quality and Reliability Management, 36(4)
552-568(2019).