A. K. Jardine;A. H. Tsang; Maintenance, replacement, and reliability: theory and applications. CRC press(2013).
C. D. Van Oosterom; A. H. Elwany; D. Çelebi; G. J. Van Houtum;
Optimal policies for a delay time model with postponed replacement.
European Journal of Operational Research, 232(1) 186-197(2014).
J. Cao; Y. Wu; Reliability analysis of a two-unit cold standby
system with a replaceable repair facility. Microelectronics
Reliability, 29(2), 145-150(1989).
J. Jia;S. Wu; Optimizing replacement policy for a cold-standby
system with waiting repair times. Applied Mathematics and Computation,
214(1) 133-141(2009).
K. H. Wang;W. L. Dong;J. B. Ke; Comparison of reliability and
the availability between four systems with warm standby components and
standby switching failures. Applied Mathematics and Computation, 183(2)
1310-1322(2006).
R. B.Abernethy; The new Weibull handbook fifth edition,
reliability and statistical analysis for predicting life, safety,
supportability, risk, cost and warranty claims. Robert B.
Abernethy.(2006).
R. K. Bhardwaj; R. Singh; Stochastic Model of a Cold-Stand by
System with Waiting for Arrival & Treatment of Server. American
Journal of Operations Research, 6(04) 334(2016).
R. K. Bhardwaj;K. Kaur;S. C. Malik; Reliability indices of a
redundant system with standby failure and arbitrary distribution for
repair and replacement times. International Journal of System Assurance
Engineering and Management, 8(2) 423-431(2017).
R. K. Bhardwaj;R. Singh; A Cold-Standby System with Server
Failure and Delayed Treatment. International Journal of Computer
Applications, 124(17)(2015).
Rakesh Gupta; A Standby System of Two-Non Identical Units With
Priority Post Repair Subject to inspection and Weibull Distribution,
International Journal of Statistics and Reliability Engineering, 6(2)
120-132 (2019).
Rakesh Gupta; P. Kumar; A. Gupta; Cost-Benefit Analysis of a
Two Dissimilar Unit Cold Standby System with Weibull Failure and Repair
Laws, International Journal of System Assurance Engineering and
Management, 4(4) 327-334 (2013).
Ram Kishan; D. Jain; Classical and Bayesian Analysis of
Reliability Characteristics of a Two Unit Parallel System with Weibull
Failure and Repair Laws, International Journal of System Assurance
Engineering and Management, 5(3) 252-261 (2014).
S. Osaki; T. Nakagawa; On a two-unit standby redundant system with standby failure. Operations Research, 19(2) 510-523(1971).
T. Tang; D. Lin; D. Banjevic; A. K. S. Jardine; Availability
of a system subject to hidden failure inspected at constant intervals
with non-negligible downtime due to inspection and downtime due to
repair/replacement. Journal of Statistical Planning and Inference,
143(1) 176-185 (2013).
Y. L. Hsu; J. C. Ke;T. H. Liu; Standby system with general
repair, reboot delay, switching failure and unreliable repair facility—a
statistical standpoint. Mathematics and Computers in Simulation, 81(11)
2400-2413(2011).
Y. L. Zhang; G. J. Wang; A deteriorating cold standby
repairable system with priority in use. European Journal of Operational
Research, 183(1) 278-295(2007).