B. S. Dhillon; Reliability and Availability Analysis of a
System with Standby and Common Cause Failures, Microelectronics
Reliability, 33(9), 1343- 1349 (1992).
D. P. Gaver; Time to failure and availability of paralleled
systems with repair, IEEE Transactions on Reliability, 12(2), 30-38
(1963).
H. Mine; H. Kawai; Repair priority effect on availability of a 2-unit system, IEEEE
Transactions on Reliability, 28(4), 325-326 (1979).
L. R. Goel; G. C. Sharma; P. Gupta; Reliability Analysis of a
System with Preventive Maintenance, Inspection and Two Types of Repair,
Microelectronics Reliability, 26(3), 429- 433 (1986).
M. N. Gopalan; R. S. Naidu; Cost-Benefit Analysis of a
One-Server System Subject to Inspection, Microelectronics Reliability,
22, 699-705 (1982).
P. K. Kapur; K. R. Kapoor; Stochastic behavior of some 2 unit
redundant systems, IEEE Transaction on Reliability, 27(5), 382-385
(1978).
R. Gupta; Probabilistic analysis of a two-unit cold standby
system with two phase repair and preventive maintenance,
Microelectronics Reliability, 26(1), 13-18 (1986).
S. C. Malik; P. Chand; J. Singh; Reliability and Profit
Evaluation of an Operating System with Different Repair Strategy subject
to Degradation, Journal of Mathematics and System Sciences, 4(1),
127-140 (2008).
S. C. Malik; S. Barak; Reliability Measures of a Cold Standby
System with Preventive Maintenance and Repair, International Journal of
Reliability, Quality and Safety Engineering, 20(6), 13-18 (2013).
S. K. Srinivasan; M. N. Gopalan; Probabilistic analysis of a 2
unit cold standby system with single repair facility, IEEE Transactions
on Reliability, 22(5), 250-254 (1973).
S. Osaki; Reliability analysis of a two unit standby redundant
system with preventive maintenance, IEEE Transactions on Reliability,
21(1), 24-29 (1972).
T. Nakagawa; S. Osaki; Optimum Preventive Maintenance Policies
Maximizing The Mean Time To The First System Failure For a two-Unit
Standby Redundant System, J. Optimization Theory Appl., 14, 115-129
(1974).