IJSREG Trion Studio

No Publication Cost

Vol 4, No 1 :

openaccess

Performance Analysis of a System of Non-Identical Units with Preventive Maintenance and Priority in Operation
Vikas Garg , M. S. Kadyan , ramesh Kumar
Abstract

The present paper is an attempt to study a two-unit (original and duplicate) redundant system with preventive maintenance and priority in operation. Initially the original unit is operative and duplicate unit is held back as cold standby. Both units undergo for preventive maintenance after a maximum operation time. Priority is given to the original unit in operation. There is a single server who visits the system immediately as per demand. The random variables associated with failure time, preventive maintenance time and repair time are statistically independent. The distributions of failure time and maximum operation time of the units follow exponential while that of preventive maintenance and repair times are taken as arbitrary with different probability density functions. Various reliability measures are obtained in steady state by using the regenerative point technique. Graphs are also plotted to depict the behavior of Mean Time to System Failure (MTSF), availability and profit of the system model for a particular case.
Full Text
PDF
References

B. S. Dhillon; Reliability and Availability Analysis of a System with Standby and Common Cause Failures, Microelectronics Reliability, 33(9), 1343- 1349 (1992).
D. P. Gaver; Time to failure and availability of paralleled systems with repair, IEEE Transactions on Reliability, 12(2), 30-38 (1963).
H. Mine; H. Kawai; Repair priority effect on availability of a 2-unit system, IEEEE
Transactions on Reliability, 28(4), 325-326 (1979).
L. R. Goel; G. C. Sharma; P. Gupta; Reliability Analysis of a System with Preventive Maintenance, Inspection and Two Types of Repair, Microelectronics Reliability, 26(3), 429- 433 (1986).
M. N. Gopalan; R. S. Naidu; Cost-Benefit Analysis of a One-Server System Subject to Inspection, Microelectronics Reliability, 22, 699-705 (1982).
P. K. Kapur; K. R. Kapoor; Stochastic behavior of some 2 unit redundant systems, IEEE Transaction on Reliability, 27(5), 382-385 (1978).
R. Gupta; Probabilistic analysis of a two-unit cold standby system with two phase repair and preventive maintenance, Microelectronics Reliability, 26(1), 13-18 (1986).
S. C. Malik; P. Chand; J. Singh; Reliability and Profit Evaluation of an Operating System with Different Repair Strategy subject to Degradation, Journal of Mathematics and System Sciences, 4(1), 127-140 (2008).
S. C. Malik; S. Barak; Reliability Measures of a Cold Standby System with Preventive Maintenance and Repair, International Journal of Reliability, Quality and Safety Engineering, 20(6), 13-18 (2013).
S. K. Srinivasan; M. N. Gopalan; Probabilistic analysis of a 2 unit cold standby system with single repair facility, IEEE Transactions on Reliability, 22(5), 250-254 (1973).
S. Osaki; Reliability analysis of a two unit standby redundant system with preventive maintenance, IEEE Transactions on Reliability, 21(1), 24-29 (1972).
T. Nakagawa; S. Osaki; Optimum Preventive Maintenance Policies Maximizing The Mean Time To The First System Failure For a two-Unit Standby Redundant System, J. Optimization Theory Appl., 14, 115-129 (1974).

ISSN(P) 2350-0174

ISSN(O) 2456-2378

Journal Content
Browser