Reliability Characteristics of a Four Unit Parallel -Cold Standby System with Operational Priority
Puran Rathi , Priti Gupta , N Nandal
Abstract
Here we describe a parallel cold standby system of four units which operate in two phases. In phase-I, there are two identical units that work in parallel and two more units (called phase-II units) are taken as spare in cold standby mode. The units of phase-I are non-identical with that of the units of phase-II. In the second phase, the cold standby units become simultaneously operative at the failure of all the units of phase-I. The single unit of phase-II cannot work alone due to its less efficiency. The repair activities of the units of the both phases are tackled by a single server who attends the system immediately as per the requirement of the user. The provision of priority for the operation of the units of phase-I has been made. Some well-known reliability characteristics such as mean sojourn time (MST), mean time to system failure (MTSF), long run availability, expected number of repairs of the units of phase-I and Phase-II, server’s busy period and expected number of visits and finally the expression for the profit function are studied for arbitrary values of different transition rates between states. The behavior of these characteristics has been observed and shown graphically. The present study has the application in power distribution systems.
Full Text
PDF
References
E. Balagurusamy; Reliability Engineering, Tata McGraw Hill Publication Co. Ltd, India (1984).
G. Kokolakis and E. Papa Georgiou; A Two Unit Parallel System Supported By (N-2) Standbys with General and Non-Identical Lifetimes, International Journal of System Science, Vol. 35(1), pp. 1-12 (2004).
G.S. Mokaddis; S.S. Elias and K.H.El. M. Said; Comparison of Two Dissimilar Unit Reliability Models with Three types of Repairs, Microelectronic. Reliab., Vol. 29(6), pp. 925-945 (1989).
Leung Kit Nam Francis; Zhang Yuan Lin and Lai Kin Keung; Analysis for a two-dissimilar-component cold standby repairable system with repair priority. Reliability Engineering and System Safety, 96, 1542-1551 (2011).
M.S. Barak; Neeraj and S. Kumari; Profit analysis of a Two-Unit Cold Standby System Operating under Different Weather Conditions Subject to Inspection, Application and Applied Mathematics, 13(1), 67-83 (2018).
N. Nandal and S.C. Malik; Profit Availability Analysis of a Three Unit Cold Standby System Using Lindley Failure and Repair Laws, International Journal of Agricultural and statistical sciences, 15(2), 543-548 (2020).
Praween Kumar and A. Sirohi; Profit analysis of a two-unit cold standby system with the delayed repair of the partially failed unit and better utilization of units, International Journal of Computer Applications, 117(1), pp. 41-46 (2015).
R. Gupta, and L.R. Goel; Cost-benefit analysis of two-unit parallel standby redundant system with an administrative delay in repair, International Journal of System Science, 21(7), 1369-1379 (1999).
Ram Kishan and Divya Jain; A two Unit Non-identical Unit Standby System Model With Repair, Inspection and Post-Repair under Classical and Bayesian Viewpoints, Journal of Reliability and Statistical Studies, 5(2),85-103 (2012).
S. Deswal and S.C. Malik; Reliability Measures of a System of Two Non-Identical Units with Priority Subject to Weather Conditions, Journal of Reliability and Statistical Studies, 8(1),181–190 (2015).
S. Kadyan; S.C. Malik and Gitanjali; Stochastic Analysis of a Three-Unit Non-Identical Repairable System with Simultaneous Working of Cold Simultaneous Working of Cold Simultaneous Working of cold Standby Units, Journal of Reliability and Statistical Studies, Vol. 13(2-4), 385–400 (2021).
S.C. Malik and Sudesh K. Barak; Reliability Measures of a Cold Standby System with Preventive maintenance and Repair, International Journal of Reliability, Quality and Safety Engineering, 20(6), 1350022-(1-9) (2013).