A. I. Shawky; The Service Erlangian Machine Interference
Model: M/Er/1/k/N with Balking and Reneging, Journal of Applied
Mathematics and Computing, 18(1-2) 431-439(2005).
D. Yue;C Li; Yue W; Nonlinear dynamic and system theory. 6(3) 295-308(2006).
GS Bura; R Kumar; Transient analysis of a limited capacity
markovianqueueing system subjected to varying catastrophic intensity and
restoration, American Journal of Operational Research, 3(2A)
34-43(2013).
G. Ayyappan; S. Shyamala; Time dependent solution of m[x]/g/1
queuing model with Bernoulli vacation and balking, International Journal
of Computer Applications, 61(21) 0975 – 8887(2013).
K. U. Chandrika; Transient analysis of a system with queue dependent servers, OPSEARCH, 43(2) 178-189(2006).
K.-H. Wang; H.-M. Huang; Optimal Control of a Removable Server
in an M/Ek/1 Queueing System with Finite Capacity”, Microelectronics
Reliability, 35(7) 1023-1030(1995).
L. Servi.;S. Finn; M/M/1 queue with working vacations (M/M/1/WV). Performance Evaluation, 50 41-52(2002).
Li; Q.L.;Xu; D.J.; Cao; J. Reliability approximation of a
markov queuing system with server breakdown and repair. Microelectronics
Reliability, 37(8)1203-1212(1997).
M. Jain; G. C. Sharma; N. Singh; “Transient anal¬ysis of M/M/R
machining system with mixed stand¬bys, switching failures, balking,
reneging and addi¬tional removable repairmen,” International Journal of
Engineering, 20(2) 169-182(2007).
P. Singh; A. Goyal; Behaviour Analysis of a Biscuit Making
Plant using Markov Regenerative Modelling”, International Journal on
Theoretical and Applied Research in Mechanical Engineering (IJTARME), 2
2319 – 3182(2013).
R. O. Al-Seedy; A. A. El-Sherbini; S. A. El-Shehawy; S. I.
Ammar; “Transient solution of the M/M/c queue with balking and reneging,
Computers & Mathematics with Applications,57(8) 1280-1285(2009).