R Subramanian, Y.V.S Sarma, A complex two-unit parallel system. Microelectronics Reliability 21(2) 273–275 (1981).
K. Murari, V. Goyal, Comparison of two unit cold standby
reliability models with three types of repair facilities. Microelectron.
Reliab., 24(1) 35-49 (1984).
R. Gupta;R. Goel, Cost-benefit analysis of two-unit parallel
system with administrative delay in repair, International Journal of
Systems Science, 21(7) 1369-1379 (1990).
G S Mokaddis; S W Labib; A M. Ahmed; Analysis of a two-unit
warm standby system subject to degradation. Microelectronics
Reliability, 37(4) 641-647 (1997).
A. Barros; C. Berenguer; A. Grall; A maintenance policy for
two-unit parallel systems based on imperfect monitoring information,
Reliability Engineering & System Safety, 91(2) 131–136 (2006).
S. N. Singh; S.K. Singh; A study on a two unit parallel system with Erlangen repair time, STATISTICA, LXVII( 1) 69-77 (2007).
S. C. Malik; P. Chand; J.Singh; Stochastic analysis of an
operating system with two types of inspection subject to degradation,
Journal of Applied Probability and Statistics, 3(2) 227-241 (2008).
S.C. Malik; Gitanjali; Analysis of a Parallel System with
Maximum Repair Time and Single Server who Appears and Disappears
Randomly. International Journal of Mathematical Archive, 3(11) 4700-4707
(2012).
R. Bashir; J P S Joorel; Reliability Measures of a Three
Non-Identical Repairable Redundant Complex System with Load Sharing
Units Working in Parallel. International Journal of Statistics and
Reliability Engineering, 1(2) 115-130 (2014).
R. Rathee; S.C. Malik; A Parallel System with Priority to
Preventive Maintenance over Replacement Subject To Maximum Operation and
Repair Times, International Journal of Engineering Development and
Research (IJEDR),2(3) 3199-3206 (2014).
M. Goe;, J. Kumar; A.S.Grewal; Cost - Benefit Analysis of a
Two - Unit Cold Standby System with Degradation, Priority and General
Distribution of all Random Variables. International Journal of
Statistics and Reliability Engineering. 4(1) 46-55 (2017).