Abstract

Here, two reliability models of a redundant system of four identical units have been analyzed stochastically in which three units work in parallel and one unit is kept as spare in cold standby. The system is considered in up-state if any three units are operative and so called a 3-out-of-3 Redundant System. There is a single repairman who visits the system immediately to do repair activities. In model-II, the repairman inspects the failed unit to see the feasibility of its repair or replacement. The time to failure and repair of the unit are taken as general. The results for some measures of system effectiveness are obtained in steady state by adopting semi-Markov process and regenerative point technique. The results for MTSF and profit function are obtained for particular values of the parameters and costs by considering exponential, Rayleigh and Weibull distributions for all random variables.  
Full Text
PDF
References

R Subramanian, Y.V.S Sarma, A complex two-unit parallel system. Microelectronics Reliability 21(2) 273–275 (1981).
K. Murari, V. Goyal, Comparison of two unit cold standby reliability models with three types of repair facilities. Microelectron. Reliab., 24(1) 35-49 (1984).
R. Gupta;R. Goel, Cost-benefit analysis of two-unit parallel system with administrative delay in repair, International Journal of Systems Science, 21(7) 1369-1379 (1990).
G S Mokaddis; S W Labib; A M. Ahmed; Analysis of a two-unit warm standby system subject to degradation. Microelectronics Reliability, 37(4) 641-647 (1997).
A. Barros; C. Berenguer; A. Grall; A maintenance policy for two-unit parallel systems based on imperfect monitoring information, Reliability Engineering & System Safety, 91(2) 131–136 (2006).
S. N. Singh; S.K. Singh; A study on a two unit parallel system with Erlangen repair time, STATISTICA, LXVII( 1) 69-77 (2007).
S. C. Malik; P. Chand; J.Singh; Stochastic analysis of an operating system with two types of inspection subject to degradation, Journal of Applied Probability and Statistics, 3(2) 227-241 (2008).
S.C. Malik; Gitanjali; Analysis of a Parallel System with Maximum Repair Time and Single Server who Appears and Disappears Randomly. International Journal of Mathematical Archive, 3(11) 4700-4707 (2012).
R. Bashir; J P S Joorel; Reliability Measures of a Three Non-Identical Repairable Redundant Complex System with Load Sharing Units Working in Parallel. International Journal of Statistics and Reliability Engineering, 1(2) 115-130 (2014).
R. Rathee; S.C. Malik; A Parallel System with Priority to Preventive Maintenance over Replacement Subject To Maximum Operation and Repair Times, International Journal of Engineering Development and Research (IJEDR),2(3) 3199-3206 (2014).
M. Goe;, J. Kumar; A.S.Grewal; Cost - Benefit Analysis of a Two - Unit Cold Standby System with Degradation, Priority and General Distribution of all Random Variables. International Journal of Statistics and Reliability Engineering. 4(1) 46-55 (2017).

ISSN(P) 2350-0174

ISSN(O) 2456-2378

Journal Content
Browser