K. Murari; V. Goyal; Comparison of two unit cold standby
reliability models with three types of repair facilities,
Microelectronics Reliability, 24(1) 35-49 (1984).
J. Cao; Y. H. Wu; Reliability of two-unit cold standby system
with replaceable repair facility. Microelectronics & Reliability,
29(2) 145-150 (1989).
S.C. Malik; R.K. Bhardwaj; reliability modelling and analysis
of 2-out-of-3 redundant system subject to conditional arrival time of
server. Proc. 13th ISSAT International Conference on RQD, Seattle (USA),
206-210 (2007).
A.K. Dhankhar; S.C. Malik; probabilistic analysis of a system
with server failure during repair, journal of reliability and
statistical studies, 3 (2), 1-10 (2010).
S.C. Malik; A. Dhankar; reliability modelling and
cost-analysis of a system with replacement of the server and unit
subject to inspection, Journal of Statistics and Management System,
16(2-3) 137-162 (2013).