K. Murari; V. Goyal; Comparison of two-unit cold standby
reliability models with three types of repair facilities,
Microelectronics Reliability, 24(1) 35-49 (1984).
J. Singh; A warm standby redundant system with common cause failures, Reliab. Engg. And Sys. Safety, 26(2) 135–141 (1989).
M. S. Kadyan; S. Chander; A. S. Grewal; Stochastic analysis of
non-identical units reliability models with priority and different
modes of failure. Decision and Mathematical Sciences, 9(1-3) 59 – 82
(2004).
S. C. Malik; Reliability Modeling of a Computer System with
Preventive Maintenance and Priority Subject to Maximum Operation and
Repair Times. International Journal of System Assurance Engineering and
Management, 4(1) 94-100 (2013).
V.J.Munday;Permila; S.C.Malik; Reliability Modelling of a
Computer System with Hardware Redundancy Subject to Preventive
Maintenance. International Journal of Statistics and Reliability
Engineering, 3(2) 176-189 (2016).
Upma; S.C.Malik; Cost Benefit Analysis of System of
Non-identical units under Preventive Maintenance and Replacement.
Journal of Reliability and Statistical Studies, 9(2) 17-27 (2016).